Description
Video
Plans
Master plan
1Floor/variant A
1Floor/variant B
2Floor/variant A
2Floor/variant B
Total area 366 m2
Floor area 227 m2
1st floor area 125 m2
2nd floor area 102 m2
Terraces and balconies 139 m2
Second light area 19 m2
1Floor/variant A
1Floor/variant B
2Floor/variant A
2Floor/variant B
Total area 366 m2
Floor area 227 m2
1st floor area 125 m2
2nd floor area 102 m2
Terraces and balconies 139 m2
Second light area 19 m2
Epolet

Choose facade color

Grey/Dark brown
Natural wood color (spruce)/Black
Black graphite
Natural wood color (pine)/Black

The cost

Cost of the house kit:
267 650 € (VAT 0%)**
Сost of the warm shell:
357 200 € (VAT 0%)**

The warm shell includes: house kit + installation + materials.
Cost of the house kit includes:
●
Detailed technical design
● Glued laminated non-settling log Nord Cross 202х260 mm pine (or spruce) (revolutionary technology, maintenance-free house)
● Modern corner «modern corner»
● High-strength load-bearing beams and columns
● Log panels for gable finishing
● European reliable fasteners for the entire house
● Rafter frames and ceiling joists
● Auxiliary timber materials for the installation of internal walls, roofing, and terraces (partition framing, terrace joists, roofing ventilation battens, ceiling battens, fascia boards, trims, and reveals)
● Finnish energy-efficient wooden windows
● Exterior doors (solid wood, reinforced)
● Delivery of materials to the construction site (cost specified for Europe).
The cost of the warm shell includes:
● The house kit
● Installation of log walls and ceiling, exterior gable finishing with log panels, and final facade finishing without painting
● Turnkey roof installation
● Turnkey roofing materials: 250 mm rock wool insulation, DELTA-MAXX waterproofing membrane, pro clima INTELLO PLUS vapor barrier membrane, DELTA tapes, roofing finish similar to cementitious tile, Aquasystem drainage system, and window sills
● Installation of windows and exterior door
● Construction equipment, auxiliary materials, overhead costs.

* Prices will be clarified at the time of contract signing

** VAT is not included in the estimate.