We value your privacy
We use cookies to enhance your browsing experience, serve personalised ads or content, and analyse our traffic. By clicking "Accept All", you consent to our use of cookies.
Cozy and stylish, at the same time very presentable house in the style of fachwerk Karnet.
It is built of high-quality laminated timber. Inside the one-storey house there are: a spacious bright living room, a kitchen, four bedrooms, three bathrooms, a lavatory, and a wardrobe. Functional layout, high-quality eco-materials, unsurpassed design. Large gable roof, panoramic windows, and a huge terrace.
Karnet will look great in both light and dark shades of facades.





| Cost of the house kit: 241 300 € (VAT 0%) ** |
Сost of the warm shell: 348 700 € (VAT 0%)** |
| The warm shell includes: house kit + installation + materials. | |
| Cost of the house kit includes: ● Detailed technical design ● Glued laminated non-settling log Nord Cross 202х260 mm pine (or spruce) (revolutionary technology, maintenance-free house) ● Modern corner «city corner» ● High-strength load-bearing beams and columns ● Log panels for gable finishing ● European reliable fasteners for the entire house ● Rafter frames and ceiling joists ● Auxiliary timber materials for the installation of internal walls, roofing, and terraces (partition framing, terrace joists, roofing ventilation battens, ceiling battens, fascia boards, trims, and reveals) ● Finnish energy-efficient wooden windows ● Exterior doors (solid wood, reinforced) ● Delivery of materials to the construction site (cost specified for Europe). |
The cost of the warm shell includes: ● The house kit ● Installation of log walls and ceiling, exterior gable finishing with log panels, and final facade finishing without painting ● Turnkey roof installation ● Turnkey roofing materials: 250 mm rock wool insulation, DELTA-MAXX waterproofing membrane, pro clima INTELLO PLUS vapor barrier membrane, DELTA tapes, roofing finish similar to cementitious tile, Aquasystem drainage system, and window sills ● Installation of windows and exterior door ● Construction equipment, auxiliary materials, overhead costs. |
* Costs will be finalized at the time of contract signing
** VAT is not included in the cost estimate and will be determined based on the construction site location.